Wednesday, July 28, 2010

Components of Electricity Rates

The electricity rates paid by consumers at the retail level can be broken down into several components - 
  • Power cost - This is the cost of producing electricity and a strong function of the fuel cost. This can be easily more than 50% of the consumers' electricity bill. 
  • Transmission and Distribution costs - these costs are generally regulated and reflect the cost of building, maintaining, and operating the bulk transmission network and the local distribution networks. 
Here are some figures taken from the NE ISO Electricity Cost Whitepaper published in 2006 - 

Components of the average forecast New England retail consumer cost of $156/megawatt-hour in 2006


Components of the wholesale electricity cost for a typical hour with gas units on the margin. 95% of the cost (total = $76.25 / MWh in 2005) is due to fuel and capacity payments.


Thursday, July 22, 2010

Data Center Energy Usage

Data Center
We are in the midst of a major IT revolution where more and more applications are moving to the "Cloud". With the rise in cloud-computing and Software as a Service (SaaS), there is an accompanying rise in large data centers that host these applications and data in the "cloud". Google, Microsoft, Amazon, IBM and virtually every major IT company is providing some type of cloud infrastructure of their own. With this rapid rise in cloud computing, the electricity needed to power these data centers is also growing at a tremendous rate and doubling every 5-years or so.

In 2006, the energy used in data centers was around 61 Gigawatt-hours representing around 1.5% of *all* US Electricity consumption. Just to put this in perspective, this is equivalent to about 5.8 Million average households and the dollar cost of this electricity is around $4.5 Billion. By 2011, the data center consumption is expected to cross 100 Gigawatt-hours (about 12 Gigawatt peak power) at a cost of about $7.5 Billion. 

It is estimated that the cost of electricity of running a server outpaces the cost of the server in about 4-years. Clearly, if we compare this to any other appliance (like our Car), the ratio is just way out of line (of course, we don't run our car 24/7/365 like these servers). But still, it is clear that more energy efficient servers are a huge lever as far as the overall data center operating costs go. 

Another equally important factor determining the data center energy cost is the efficiency factor. This is the ratio of total energy used by the data center to the energy used in the servers themselves (i.e. useful energy towards computing). The best of breed data centers have managed to push this ratio down to around 1.4X by innovative rack and building designs and heat dissipation techniques. More typical number is around 1.8X for the industry at this point. 

Clearly there is some serious opportunity in improving the overall data center efficiency all around - in design of hardware, building and also software to manage the scheduling of computing tasks in a more energy efficient manner. A lot of the large data center operators are becoming power producers themselves and are now locating the facilities near the source of the power to reduce power costs. They are also trading directly in the wholesale power markets instead of buying electricity from a utility company. It would be interesting to see what role electric storage can play in the operation of these data centers by storing electricity when the cost of electricity is low and then using it at times of high demand. 

Electricity Consumption at a Large IT company

Recently I had the privilege of meeting the Global Energy Director of one of the world's largest networking equipment companies and learn about the company's electricity usage and energy efficiency programs. There has been a lot of buzz about the building and data center electricity management and I wanted to get an idea of some of the numbers involved. 
  • This company has direct access in California which means that they are allowed to buy electricity on the wholesale day-ahead markets. Here are some figures that I was able to gather - 
  • There spend on the day-ahead market is about $25 Million / year
  • By actually buying electricity in the wholesale markets, the company is paying around $0.10 cent / KW-hour as opposed to $0.14cents that PG&E would have charged them. 
  • Overall spend on electricity is around 125 Million / year
  • Use around 1.2 Gigawatt-hours of energy per year
  • Are usually able to predict their demand within +/-5% of actual for trading in the day-ahead market. But even a 5% error is around 1.25 Million / year. 
  • The energy factor is about 1.8. This is the ratio of electricity used by the servers to the total electricity used in the data-center. A number of 1.0 means all the electricity is used by the servers. Anything over that is the overhead of cooling the building and heat dissipation. Industry's best numbers are around 1.4. Obviously, each decimal point reduction has big value in terms of cost.
Note, this is just one company. So the actual market for energy efficiency is huge! No wonder companies like Enernoc, Comverge, Honeywell etc. are all going after the building efficiency market.

Wednesday, July 21, 2010

The War of EV Charging Stations

The War


A war is  brewing between two Silicon Valley companies about the future of electric vehicle charging infrastructure. The reigning champ is none other than Palo Alto based Better Place with over $700 Million in funding. The company's most recent round of $350 Million places the company at a reported market cap of $1.25 Billion. Estimates call for another $1 billion in funding to realize the companies ambitious vision of getting the world off of fossil fuel based cars. Better Place is promoting a hybrid model of charging and battery swapping stations. The advantage is a fast turn-around time similar to the time needed to refuel the gas tank at a conventional gas station. There are other operational advantages also in this approach, such as the ability to pre-charge the batteries at off-peak charging times when the price of electricity is lower and then re-use it anytime. However, the company faces the daunting task of enabling the entire eco-system and creating some sort of standardization in the battery that is used with different makes/models. The company will also need to overcome the emotional issues associated with car-owners not owning one of the most critical and expensive pieces of equipment in their cars.

Better Place Battery Replacement Service
On the other spectrum of this debate is a relative new comer which has been installing charging stations which are more like conventional gas stations. These charging stations are installed at parking spots, homes and streets and consumers can access them by becoming a subscriber which gives them access to any of the charging stations in the entire fleet. The software also allows customers to discover the nearest available charging point given the current location. While the business model is very clean and the company is quite capital efficient having raised $14 Million in series B and has more than $37 Million in federal funding grants to establish a number of charging stations in North America. The charging times with the current charging stations is quite large (around 45 minutes with Level 3 chargers) but the low-cost, low capital, distributed nature of Coulumb's charging solution provides a very interesting alternative to Better Places's highly capital intensive model.
Coulomb Charging Station
Please leave your thoughts and comments on who you think will dominate the EV charging infrastructure of the future.

Electric Vehicles (EVs)

In the recent weeks there has been a number of events that have led me to believe that 2011 could be the breakout years for EV adoption in the US. First is the BP oil spill which just reinforces the fact that drilling for oil is simply not sustainable in the long term, not to mention the enormous security risk of transferring trillions of dollars to outside economies,  some of whom are not friendly towards us (Note: Canada is our largest oil trading partner closely followed by the middle-east).

Fisker-Karma
Tesla Roadster
Tesla Model-S
Some of the recent headline events -
  • Almost all major manufacturers have now announced their plans for introducing EVs. 
    • Toyota announced its plan to introduce its 2nd generation of RAV4 EV in partnership with Tesla. Toyota also announced a $50-Million investment in Tesla recently. 
    • With Prius, Toyota already has the largest market share in the Hybrid Electric Vehicles which can be converted into a plug-in electric vehicle using A123's Hymotion L5 PCM
    • Honda announced its plan to introduce EVs in 2012 in US
    • GM will have Chevy Volt in 2011
    • Nissan has Nissan Leaf and a rumored sports version of the Leaf
    • Ford has Focus Electric
  • Hot IPOs and funding events
    • Tesla is trading at over $2Billion in market cap. Their 4-door Model-S sedan is expected to come on the market in 2011
    • A123, a provider of batteries for EVs is trading at $1-Billion in market cap
    • Fisker is expanding its manufacturing base with a new round of $500-Million+ funding from DOE to manufacture its Karma sedans. 
  • Emergence of charging infrastructure from independent third party providers is reaching critical mass now - 
    • BetterPlace  - providing a network of battery replacement centers
    • Coulomb - providing a network of charging stations
EVs represent one of the biggest revolutions in the automobile industry in over a century. Introduction of EVs will give rise to a number of interesting problems in terms of managing the electric grid which is going through its own once in a century revolution with introduction of new Smart Grid technologies. The next 10-years promise to be an exciting time to be at the intersection of two of the largest industries in modern society undergoing simultaneous and overlapping transformation!

Monday, July 19, 2010

Introduction to (Electricity) Demand Response

Demand Response is a way to make electricity demand respond to conditions on the supply side to balance the flow of power. Generally, this means that customers would reduce their load in response to price signals during critical times when the demand is expected to surge.

Typically, the ratio of average load to the peak load (i.e. the capacity factor) is around 40%. This means that on an average only 40% of all the available capacity is used to supply the electricity. Usually, the peaking power plants are  more expensive than the base load production plants. Demand response can be thought of as an alternative to peak power plants that are more efficient and 100% clean. Instead of bringing expensive peak plants online during the periods of high demand, a utility can initiate a DR request and ask customers to reduce the load in such an event.

In competitive power markets operated by ISOs/RTOs, there are a number of market instruments that allow demand response provider and industrial as well as residential customers to supply demand response without having to own transmission resources. There are four broad categories of demand  response -
  • Capacity - Capacity resources commit (usually for a term of year or longer) to reduce load when directed by ISO/RTO. This is the largest segment of DR and is now nearly 10% of the peak demand. 
  • Ancillary Services - In ancillary services market, DR typically provides non spinning reserves. 
  • Energy Prices - Resources that commit to reduce consumption based on price on a short-term basis
  • Energy Voluntary - Resources are compensated for reducing consumption during emergency conditions but are not obligated to do so. 
According to a study published by ISO New England, a 500 MW increase in DR cuts cost by $32 million / year. A 5% reduction in peak electricity demand during the top 1% of the hours of the year would have a net present value of about $60 Billion in benefits.

    An Overview of the Wholesale Electricity Markets in the US

    At present about two-thirds of the population in US and more than half the population in Canada is served by the transmission system and wholesale markets operated by Independent System Operators (ISO) and Regional Transmission Operators (RTO). There are 10 ISOs/RTOs in the US and Canada as shown in the figure below. 
    The key responsibilities for ISO/RTOs are - 
    • Bulk power system operations - This includes maintaining reliable operations of the transmission network including outage coordination, generation scheduling, voltage management, ancillary services provision, and load forecasting. 
    • Wholesale Electricity Markets - A market where energy providers submit their supply offers and purchasers submit their demand bid. ISO establishes the market clearing prices so that the lowest cost supplies are used until the demand is met. A number of studies have confirmed that such a centrally controlled competitive market market has reduced the cost of electricity for the consumers. Typically, an ISO operates several different markets to cover the power system operation over different time-scales. These include - 
      • Day Ahead - Usually, the buyers and sellers submit bids and offers based on the day-ahead forecast of supply and demand and the ISO clears the market for each hour of the day so that supply and demand are matched at the minimum cost subject to transmission and other constraints. 
      • Hour Ahead - Similar to the day-ahead market but now an hour ahead instead of the day-ahead.
      • Real-time - Also called Energy Balancing, cleared every 5 or 10 minutes usually in "increments or decrements" from the hour ahead commitments previously established. Since the day-ahead and hour-ahead markets are cleared for "flat" power profile during the hour, the real time markets are needed to balance the changing demand and production continuously. 
      • Ancillary  Services
        • Frequency Regulation - This is a market to provide service that balances second-by-second variation in output to match instantaneous demand and maintain system frequency and voltage levels within a very tight tolerance. Typically, this is around 0.5-1% of the peak load and generators that provide this service have to hold that capacity out of energy production to accommodate the fluctuations. They incur an opportunity cost for lost production (if the market prices are higher than the cost of production) as well as additional wear-and-tear on the equipment. 
        • Spinning Reserves - This is the extra capacity on line (i.e. spinning) that can respond quickly in case of a major system disturbance such as the loss of a generator. Typically, this is around 5-10% of the peak load and sufficient to cover the operation of the largest single generator going off-line. 
    The ISO plays are key enabling role in promoting sustainable energy technologies for the grid. These include - 
    • Demand Response - In 2009, about 30 Gigawatts of demand response in North America ISO/RTO markets representing about 7% of the peak electricity demand in these regions. This is an equivalent of 60+ power plants of 500MWs each. 
    • Renewables - ISO/RTOs provide a one-stop shop for an power producer such as a wind farm for interconnection to the grid, access to energy spot markets, financial mechanisms like day-ahead market and financial transmission rights. By providing a flexible and competitive marketplace operating over a broad region, ISOs enable a renewable resource owner to sell its power outside of a local region. ISOs also coordinate the transmission planning process to evaluate and improve the transmission system and more efficient integration of renewable resources into the grid.